Entries Tagged 'Programming' ↓

About Internet Speed Test Technology

Internet-speed development is an Agile software package development method with a combined spiral pattern/ waterfall pattern along with daily builds aimed at producing a product with high velocity. It was produced in the late nineties since software package growth was changing rapidly. Companies were having troubles delivering products with the correct prerequisites within the time scheduled for the project and as such were changing to more agile software package growth methods.

Often one of the biggest problems in software engineering is which the requirements change quickly as well as the Net-velocity development procedures was produced to adapt to this position. The idea is to combine two key standards in software package engineering models namely the spiral pattern as well as the waterfall pattern into a new model as well as base a new software package engineering procedures on this new pattern. The main disadvantage of the waterfall model was which is was very rigid and not very flexible when it gets to changes in requirements, while the disadvantage of the spiral model was that is was not very integrated.

The idea behind Net-speed development is that the combination of these molds will result in a method which does not have these disadvantages and is a better method to use in situations where prerequisites can switch rapidly, but the project has to be executed in a structured way. The first concept that is very key to Net-speed growth is the creation of a vision and range (project management). What this means is that in the start of the project a global definition of the scheme is created which explains what the system plans to be as well as what is inside the scope and what is not. This is one of the fundamental steps as it gives the developers some guidelines as to what the scheme will be without suspending any requirements. The scope can be documented in a vision statement.

Another very important concept within this method is scope management. The scope needs to be managed throughout the project to prevent range creeping which results in delays. Changes in the range can be made but this will always be affected by trade offs betwixt features, resources as well as time.

This article about internet speed test is based on information publicly available on wikipedia and testinternetspeed.